Project Limits:
The proposed safety improvements are located at the intersection of Mill Creek Road and Stoney Batter Road. The limits of the project extend 0.10 miles north along Mill Creek Road, 0.20 miles south along Stoney Batter Road, and 0.20 miles east along Mill Creek Road. Project Need: This project was identified in the Hazard Elimination Program (HEP) due to high crash rates. 50 Crashes were reported over a six year period between Jan. 2005 and Feb. 2011. 11 of the crashes resulted in personal injury and one was alcohol related. Project Overview Proposed improvements include reconfiguring the geometry of the intersection by reconstructing the three approaches to improve safety and traffic flow. The proposed plan will realign Mill Creek Road (east of existing intersection) and Stoney Batter Road to accommodate the east/west thru movement. Mill Creek Road to the north will form a T-intersection with the realigned road. Anticipated/Actual Start Date Anticipate beginning Construction in fall 2013 Anticipated/Actual End Date To Be Determined Next Meeting Date or List of scheduled meetings A public workshop was held on March 28, 2011 at Thomas McKean High School Current Construction Schedule To Be Determined |
|