I-95 Newark Toll Plaza
Aerial View of the I-95 Toll Plaza
Description:
Reconstruct and reconfigure the Newark Toll Plaza to incorporate two
highway-speed E-ZPass lanes in the northbound and southbound lanes.
Cost:
Approximately $43 million, to be obligated in the
1-year timeframe.
Justification:
This toll plaza experiences high levels of congestion due to the current plaza
configuration. As approximately 55 percent of travelers through the plaza
utilize E-ZPass, congestion would be drastically reduced with high-speed lanes.
This plaza is a regular complaint of motorists traveling through this state, and
leaves travelers with a negative impression - in many cases their only
impression -- of Delaware, impacting reputation, business, tourism and economic
development.
|
Hot Topics
ARRA Projects
- ARRA Home
- Bridge Maintenance - Christina
- Bridge Maintenance - I-495
- Bridge Maintenance - 1-325
- Bridge Painting, I-495
- Bridge Painting, South District
- Buses, Sussex County
- Centreville Streetscape
/Traffic Calming
- DART Mid-County Facility, New Castle County
- Dover Transit Center
- Hockessin Streetscape
/Drainage Project
- I-95 Concrete Medians Replacement
- I-95 Toll Plaza
- Lightship Overfalls, Lewes
- Market Street Project, Wilmington
- NCC Greenway Industrial Track Phase I
- NCC Greenway Millcreek
- NCC Guardrail Upgrades
- Pavement Rehabilitation
Projects Statewide
- Rail Cars
- Rehabilitation of Epoxy Pavement Markings
- Rehoboth Beach Boardwalk Refurbishment Phase II and III
- Route 10 and Sorghum Road, Kent County
- Route 299 Park and Ride, Odessa
- Route 404/Newton Road Railroad Crossing, Bridgeville
- Rt. 896 and Rt. 4 Park & Ride, Newark
- Solar Energy Program
- Traffic Signal Improvements (2009)
- US13& Rte 8 Intersection
- Wyoming Mill Realignment
 = Completed
|
|
|
|
Last Updated: Monday, 26-Apr-2010 13:57:25 Eastern Daylight Time
|